Client: City of Scottsdale
Year:
2008
Primatech analyzed the existing and future drainage conditions within the Pima Road corridor and an evaluated alternatives that could be implemented as part of an overall improvement plan. The drainage analysis examined the offsite flows, including peak discharges, flow paths, and existing drainage facilities. Primatech evaluated drainage alternatives for the Pima Road improvements design, the proposed alignment’s impact on the drainage patterns, and the design of the proposed drainage facilities for the onsite drainage of Pima Road.
